Automated Parking Solutions Modification

  • Client: APS
  • Location:  26 Poyton Terrace, Auckland
  • Service: Industrial, Machinery modification
  • Completion: July 2017

 

work includes:

Install the 28 sole plates in the basement leveled to 1.9mm tolerance.
112 chemset studs in core drilled holes.
30mm of non shrink flowable grout under the sole plates.
Install the rails on top of the sole plates to be aligned to a 1mm tolerance
Each rail to be spliced in the middle