We fabricated and installed galvanized building bases for Snow Planet’s new Alpine Village.
The environment was the real challenge: our team had to cut, weld and install the bases in the snow, meaning they worked long hours with very low temperatures (-2 degrees Celsius).
Thorough planning and methodology made installation run smoothly with zero harm.