Mitre 10 Whangaparāoa is moving into the Coast town centre, taking over a 5000-square-metre retail space. This space was previously used by The Warehouse.

Moving to this new site will give Mitre 10 about 50 per cent more floor space. This will create room for a bigger garden centre and a larger indoor retail area.

And it also means that the building must be adapted to Mitre 10 needs.

We were contracted by Teak Construction to supply and install structural steel for:

  • the Entrance Vestibule welded to the existing steel (HDG finish)
  • the 2 new roller doors (prime finish)