Customer: Teak Construction
Location: Auckland
Services Provided: Fabrication and Installation of structural steel
Completion: June 2020
We supplied and installed structural steel for a new classroom at Ficino Primary School in Mount Eden, Auckland.
All the pre-fabrication of the structural steel was done in our workshop.
Then, installation was carried out throughout 2 months. (We had to pause installation due to Covid-19 Level 4 lockdown)
Working on a live site is always a challenge on its own but working at a school it is very different story. We have to be aware of students and parents dropping of and fetching their children.
At these sites safety and alertness have to be at 110%. Requiring the correct procedures, preventive measures and PPE in place.
We were able to completed this job with zero incidents on site.