Snells Algies | Wastewater Pipeline
Aimecs was contracted by McConnell Dowell for the welding of the wastewater pipeline at Snells Algies beach.
It is a 2 km pipeline with 1200m OD and 32mm wall thickness
Aimecs was contracted by McConnell Dowell for the welding of the wastewater pipeline at Snells Algies beach.
It is a 2 km pipeline with 1200m OD and 32mm wall thickness
Aimecs has invested in the next generation of pipe welding gear, putting us ahead of all completion in the Austral-Asian Region. We have been using a semi-automated orbital welding system allowing us to exceed customer expectations on this project and build a long term relationship with our customer.