CLL | Site Works Madden St
Since late 2019 we’ve been working at the new building on Madden St: Welding, splicing and cutting.
Since late 2019 we’ve been working at the new building on Madden St: Welding, splicing and cutting.
Fabrication and installation of 21mt aluminum gangways and new stairs at Kauri Point
During her general maintenance in dry-dock we were contracted to replace the walkway supports and bed frames inside the machinery room.
Aimecs was contracted by McConnell Dowell for the welding of the wastewater pipeline at Snells Algies beach.
It is a 2 km pipeline with 1200m OD and 32mm wall thickness
Fabrication and installation of steel and aluminum structures for the renovated Event Cinema Westgate
We fabricated and installed galvanized building bases for Snow Planet’s new village.
Custom made cable spooling drum shaft, flanges and bearing for the French cable-layer vessel Ile de Re
Heavy machinery maintenance for Atom Heavy Hire
Learn more by clicking below
Team of certified welders working at Brown Street, Ponsonby, Auckland since June 2019.
Our certified welders have been working non-stop at Browns Bay since February 2018.
We replaced 160 meters of oily water bilge pipe due to corrosion.
This was done over a 3 weeks period with a 100% pass test