During her call at Auckland terminal, M/V Carmen suffered severe damages to her loading ramp to a point that the vessel couldn’t resume her journey without going into repairs.
Aimecs was brought in to initially assist the crew.
Eventually our boiler maker team carried the full repairs to class satisfaction.
Work was carried out 24/7 to avoid delays on the vessel’s tight schedule.