Customer: Maersk Line
Location: Auckland – Tauranga
Services provided: Fabrication, Welding, Transport
Completion: June 2020
Our Marine Team received an urgent call to repair Maersk Inverness gangway – a container hit her gangway causing severe damage.
We quickly arranged transport from Auckland Port to our workshop and began with the structural repairs.
Although we had a very tight window, our fabricators and welders worked 24/7 to repair the gangway on time.
The gangway was transported to Ports of Tauranga and installed on board just in time before the vessel’s scheduled departure.
All repairs are ABS class approved. Therefore, it required NDT Test, Load Test and standard QA documents:
- Welding Procedure Specification,
- Welders’ certificates,
- consumables and materials certificates.
Thanks to our amazing team and management, anything is possible – Fast and high quality results.