Sika | Maintenance and Breakdown Service
Aimecs is providing weekly maintenance service and 24h/7 breakdown attendance. When a customer call our breakdown line, we make everything we can to resume their production as soon as possible.
Aimecs is providing weekly maintenance service and 24h/7 breakdown attendance. When a customer call our breakdown line, we make everything we can to resume their production as soon as possible.
We are supplying and installing structural steel for a new classroom
Aimecs was contracted by McConnell Dowell for the welding of the wastewater pipeline at Snells Algies beach.
It is a 2 km pipeline with 1200m OD and 32mm wall thickness
Fabrication and installation of steel and aluminum structures for the renovated Event Cinema Westgate
Fabrication and Installation of new turntables for Geyser carpark
We fabricated and installed galvanized building bases for Snow Planet’s new village.
M/V Carmen suffered severe damages to her loading ramp.
We attended and repaired on time and to class satisfaction.
We replaced 160 meters of oily water bilge pipe due to corrosion.
This was done over a 3 weeks period with a 100% pass test
Aimecs Engineering was selected by industry’s heavy weight Goodman Fielder to supply a new pie baking oven for their new production line in Palmerston North.
We are providing primary structural steel for a high-end residential building in Takapuna, Auckland.
Aimecs has invested in the next generation of pipe welding gear, putting us ahead of all completion in the Austral-Asian Region. We have been using a semi-automated orbital welding system allowing us to exceed customer expectations on this project and build a long term relationship with our customer.