MV Carmen | Loading Ramp Repair
M/V Carmen suffered severe damages to her loading ramp.
We attended and repaired on time and to class satisfaction.
Navy Vessel | Bilge system piping renewal
We replaced 160 meters of oily water bilge pipe due to corrosion.
This was done over a 3 weeks period with a 100% pass test
Southern Moana | Cargo crane jib repair
Removal of cargo crane jib
Crop and replace of damaged sections
Reinstatement / rigging, load testing & class NK certification
Maersk | Investigation and recovery of generators
Container ship in critical situation: 2 of the 3 generators out of service disabling her to continue commercial operations.
MY Asteria | Freshwater Pipework
Replaced corroded mild steel freshwater pipework with 316L stainless steel and fittings for MY Asteria
Maersk Innoshima | HFO purifiers
HFO purifiers non-operation causing vessel Maersk Innoshima to return to port.
Aimecs 24h/7 availability and capability were key in this job where our customer needed high level of expertise delivered in a very small time-frame.
Great success meeting our #1 goal, customer satisfaction.
IMG | Hull and structural plating repairs
Replacement of damaged and rusted shell plating, All 100% NDT (non destructive testing) of welds.
All completed to Lloyds Class requirements
MT Kakariki | Pipe Works and Hull Plate Replacement
The project works included:
- Completion of pipe works in ballast tanks and double bottom.
- Cropping and replacing 600 NB pipe carbon steel in a confined space.
- Replacing a 9x3m hull plate section with internal structure
RNZN Canterbury | Conversion of void spaces
Conversion of void spaces in ballast tanks
Fabrication and installation of 400 NB pipes
Ile de Re | Cable layer Conversion
The project works comprised of installing an A Frame to the vessels back deck as part of the vessel’s conversion from cable repairer to cable layer.