Sofrana Surville | Sea Water Pipe
Fabrication and installation of new SW Pipe on board container vessel
Fabrication and installation of new SW Pipe on board container vessel
Gangway maintenance, repairs, and upgrades for container vessel.
We were contracted for maintenance works on Kakerangi Yacht. Our team repaired all damaged areas and left the boat ready to be repainted.
Engine liner replacement for MV London Express
While in anchorage, our team attended the vessel Southern Trader and carried out the repairs according to class requirements.
High quality repairs.
Materials and load test under ABS supervision.
Our team delivers quality services 24/7
Urgent repair of gangway hit by a container.
Pick up at POAL, ABS class repair in our workshop and delivery at Ports of Tauranga in less than 72 hrs
Fabrication and installation of 21mt aluminum gangways and new stairs at Kauri Point
During her general maintenance in dry-dock we were contracted to replace the walkway supports and bed frames inside the machinery room.
Custom made cable spooling drum shaft, flanges and bearing for the French cable-layer vessel Ile de Re